Blog
  • What are the requirements of transport packaging after the completion of China's PCBA processing?

    After the production of PCBA in China, we need to transport the PCBA into the hands of our customers in various ways. In the course of transportation, we need to pay attention to the following requirements....

    2018/07/07 zhengxiaowei 186

  • What is the "burning" program in PCBA?

    In the process of PCBA processing, in order to enable the PCB board to achieve certain specific functions, in addition to the hardware problem, but also need to join the software function. At this time, we need to carry out the "burning" program. Before starting the "burning", we should test whether the PCB board is qualified, and then choose the appropriate burning mode. Nowadays, the way of burning is usually divided into offline burning and online burning....

    2018/06/29 zhengxiaowei 204

  • What is a PCBA test?

    The process of PCB Assembly is very complex, including PCB board manufacturing, component procurement and inspection, SMT assembly, DIP plug-in, PCBA test and many other important processes. Because in the process of production, various problems may occur due to improper equipment or operation, so it cannot make sure that the produced products are all qualified. Therefore, PCBA testing is needed to ensure that no quality problems occur with each product. The PCBA test mainly includes five forms: ICT test, FCT test, aging test, fatigue test, and harsh environment test....

    2018/06/16 zhengxiaowei 198

  • What is the PCBA stress test principle?

    First, the strain gauges are attached to several different positions on the PCB. When the process or work station is operated, the strain gauges are connected to the measurement instrument system to make the stress quantitatively display the records. Namely: Strain - Resistance Change - Voltage (or Current) Change - Magnification - Recording - Data Processing...

    2018/06/09 zhengxiaowei 176

  • The reason and solution of the poor wettability of PCBA soldering

    The reason and solution of the poor wettability of PCBA soldering...

    2018/05/29 zhengxiaowei 170

  • What is the PCBA inspection standard for finished products?

    What is the PCBA inspection standard for finished products...

    2018/05/24 zhengxiaowei 186

  • What are the PCBA workshop management requirements and precautions?

    PCBA production equipment and PCBA processing technology have certain requirements for the workshop's power supply, ventilation capacity, temperature, humidity, air cleanliness, anti-static, and production personnel wear accessories....

    2018/05/14 zhengxiaowei 204

  • Common PCBA Poor Welding Conditions

    There will be poor welding in PCBA prouction process, due to the influence of various uncontrollable factors such as plate, solder paste, flux, worker, environment and etc. What are the general conditions of poor welding?...

    2018/04/28 zhengxiaowei 155